D&K CONSTRUCTION & ENGINEERINGD&K CONSTRUCTION & ENGINEERING
Electrical works

Full Electrical Works Singapore

The whole installation wired, tested, and labelled.

Full renovation electrical works — rewiring, new points and lighting circuits, DB upgrades, and testing for a complete home or office fit-out.

  • Rewiring and new circuits
  • DB board upgrades
  • Tested and labelled

Island-wide · Singapore

HDB, condominium, landed, and commercial properties — one contractor team, written quotes before work starts.

Overview

Why this work is worth doing properly.

A full renovation is the right time to sort the electrical installation properly, because the walls and ceilings are open. Adding points later means chasing and patching finished surfaces; planning the whole layout now means clean cable runs and a board that can actually carry your appliances.

We carry out complete renovation electrical works — rewiring, new lighting and power circuits, distribution board upgrades, and coordination with the ceiling, aircon, and carpentry trades. Everything is tested and labelled before handover.

HDB flatsCondominiumsLanded homesOfficesRetail & F&B

What we cover

Electrical Works works we carry out.

Rewiring

Partial or full rewiring for renovated units, replacing brittle or undersized cabling with clean, planned runs.

New points and circuits

Power points, dedicated appliance circuits, USB sockets, and data provisioning set out with your layout.

Lighting circuits

Downlights, cove lighting, feature and pendant points coordinated with the false ceiling before boarding.

DB board upgrade and testing

Distribution board upgrades, additional breakers and RCCB, plus full testing and clear circuit labelling.

How it works

From your first message to a clean handover.

  1. 01

    Plan the installation

    We work out point positions, lighting, and appliance loads with your layout so the whole installation is set before work starts.

  2. 02

    First-fix wiring

    Cables and conduits are run while walls and ceilings are open, coordinated with the ceiling and aircon trades.

  3. 03

    Second-fix and DB works

    Points, switches, and fittings are installed, and the distribution board is upgraded and wired to suit the new load.

  4. 04

    Test and label

    Continuity, polarity, and earth leakage are tested, every circuit labelled, and the work area left clean.

Questions

Electrical Works FAQs

Still unsure? Call +65 9348 1142 and speak to someone who does the work.

Should I rewire during a renovation?

If the unit is older or the wiring is undersized, a renovation is the ideal time because the surfaces are open. Rewiring later means chasing and patching finished walls, so planning it now saves cost and mess.

Do I need to upgrade the DB board?

Often yes, if you are adding heavy appliances, more circuits, or an aircon system. Older boards with few circuits can be at their limit. We check the loading and advise whether an upgrade is needed before adding load.

Do you handle the lighting layout too?

Yes. We coordinate the lighting circuits with the false ceiling so downlights, coves, and switch positions are set out before boarding, rather than cut in afterwards.

Get started

Tell us about your electrical works job and we will quote it clearly.

Send photos over WhatsApp for a fast estimate, or call us to arrange a site visit anywhere in Singapore.